PatrikPaprika / Wikimedia Commons, CC BY-SA 3.0 · CC / FAL
Places
Jirásek Bridge
Construction of Jirásek Bridge began in spring 1929 to improve connections between the New Town and Smíchov. František Mencl and Vlastislav Hofman provided its engineering and architectural design. The reinforced-concrete structure is approximately 310 metres long and twenty-one metres wide, with six arches spanning between forty-five and fifty-one metres on granite-clad piers.
Details to look for
- The restrained concrete arches
- The Dancing House beside the New Town end
- Views towards Children’s Island and Smíchov
History and context
Parts opened before the complete bridge was finished in 1933. It is named after writer and historian Alois Jirásek, who lived from 1903 to 1930 near the square that also bears his name. During the war the bridge briefly became Dientzenhofer Bridge before recovering its former name.
Tram tracks were planned but never used. The bridge’s restrained appearance illustrates the change from decorative nineteenth-century civic architecture to an interwar functional approach. It is protected as heritage and forms a prominent foreground to the Dancing House at its eastern end.
Satori Cities
On a Satori Cities walk, Jirásek Bridge is not treated as a box to tick. It is a place to notice stone, water, and the pause between two banks, to slow the body down, and to receive the historical context only after perception has done its work.
